avolites pearl exper ttitan ユーザーズマニュアル
Copyright Avolites Limited 2010
8. Cue Lists - Page 97
PearlExpertTitan_Man_v3.doc 29/03/2010 13:28:00
•
[Link After Previous Cue]: The cue fires when the previous cue
has finished its delay in and fade in times. A Link Offset can be
set to add a delay between the previous cue finishing and this
cue firing. The offset can be given as a time in seconds, or as a
percentage of the fade time of the previous cue.
•
[Link With Previous Cue]: The cue fires at the same time as the
previous cue fires. A Link Offset can be set to add a delay
between the previous cue firing and this cue firing, set either in
seconds or as a percentage of the fade time of the previous
cue.
These options allow you to create complex self timed sequences by
building up simple steps. For example if you wanted the following
effect:
•
Go is pressed, Fixture one starts fading up over 20s
•
After 10s Fixture two fades up over 15s
•
Both lights stay on for 5s
•
Both lights go off in 3s
You could program
•
Cue 1 - Fixture 1 @ 100%, Fade In 20s, Link Wait For Go
•
Cue 2 - Fixture 2 @ 100%, Fade In 15s, Link With Previous,
Link Offset 10s
•
Cue 3 - Fixture 1 AND 2 @ 0%, Fade Out 3s, Link After
Previous, Link Offset 5s
Note: To obtain the effect which was called “cue overlap” in previous
versions of software, use [Link With Previous Cue] and set a
percentage Link Offset time. Link Offset of 100% is equivalent
to Cue Overlap of 0% and vice versa.