Install the Router and Configure Software
97
Chapter 8
Install the Router and Configure Software
Before installing the router, prepare the site as described in “Prepare the Site” on page 39 and 
unpack the router from the shipping crate as described in “Unpack the Router” on page 92.
You can install the router into a rack either with or without the help of a mechanical lift. 
Because a fully configured router weighs approximately 280 lb (127 kg), using a mechanical 
lift is recommended. If you do not use a lift, you must remove most components from the 
chassis to reduce its weight before installation, then reinstall them before powering on the 
router. 
This chapter describes both methods, and also describes how to connect management and 
alarm devices, PIC cables, and power cables:
Tools and Parts Required
You need the following tools and parts to install the chassis and its components:
„ Mechanical lift (recommended)
„ Phillips (+) screwdrivers, numbers 1 and 2
„ Flat-blade (–) screwdriver, 2.5 mm (for serial cable connector)
„ Phillips (+) screwdriver, 2.5 mm (for alarm relay contacts)
„ Electrostatic bags or antistatic mats, one for each electronic component removed during 
installation without a mechanical lift
„ ESD grounding wrist strap