Install the Router and Configure Software
Install the Router without Using a Mechanical Lift
99
5.
Align the bottom hole in both front- or center-mounting ears with a hole in each rack 
rail, making sure the chassis is level.
6.
Install one of the mounting screws provided (in the accessory box shipped with the 
router) into each of the two aligned holes.
7.
Moving up each post or ear, install a screw in every mounting hole.
8.
Verify that all the mounting screws on one side of the rack are aligned with the mounting 
screws on the opposite side and that the router is level.
9.
Move the lift away from the rack.
10. To complete the installation, proceed to “Connect the Router to Management and Alarm 
Install the Router without Using a Mechanical Lift
If you cannot use a mechanical lift to lift the router into the rack, you can install it manually. 
First you need to reduce the weight by removing components from the chassis. The reduced 
chassis weight is approximately 180 lb (82 kg), so lifting it safely still requires three people to 
lift and one to insert the mounting screws. 
Table 20 lists the weight of major components.
Table 20:  Chassis Component Weights
To install the router without a mechanical lift, perform the procedures described in the 
following sections:
Component
Approximate Weight 
(lb)
Approximate Weight 
(kg)
Air filter
0.5
0.2
Cable management system
2
1
Fan tray
5
2
FPC with 4 PICs installed
3
1
Lower impeller assembly with craft interface
9
4
Power supply
20
9
Routing Engine housing
17
8
Upper impeller assembly
10
4
System Control Board (SCB)
1
0.5