Juniper CBL-M40-PWR-AU ユーザーズマニュアル

ページ / 268
Provide Power to the Router
M40 Internet Router Hardware Guide
126
3.
Turn on the power to the management device that is connected to the Routing Engine 
through the craft interface port labeled 
CONSOLE
AUXILIARY
, or 
MANAGEMENT ETHERNET
For more information on connecting management devices, see “Connect the Router to 
Management and Alarm Devices” on page 119.
4.
Press the power switch on one power supply to the 
ON
 ( 
|
 ) position. Verify that the green 
LED labeled 
OK
 on the power supply faceplate eventually lights steadily.
5.
Press the power switch on other power supply to the 
ON
 ( 
|
 ) position and confirm that 
the 
OK
 LED lights as described in Step 4. If the LED is not lit after 60 seconds, repeat the 
6.
On the management device, monitor the startup process to verify that the system has 
booted properly.
After a power supply is turned on, it can take up to 60 
seconds for status indicators—such as LEDs on the power 
supply, 
show chassis
 commands, and messages on the 
craft interface LCD—to indicate that the power supply is 
functioning normally. Ignore error indicators that appear 
during the first 60 seconds.
The Routing Engine boots as the power supply completes 
its startup sequence. If the Routing Engine finishes booting 
and you need to power down the router again, first issue 
the CLI 
request system halt
 command. For complete 
If after powering on the power supply you must power it 
off, wait at least 60 seconds. After powering off a power 
supply, wait 60 seconds before turning it back on.