Juniper CBL-M40-PWR-AU ユーザーズマニュアル

ページ / 268
Maintain and Replace Packet Forwarding Engine Components
Maintain the SCB
169
Figure 78:  Install a PIC
Maintain the SCB
The System Control Board (SCB) occupies the center slot of the card cage, installing into the 
backplane from the front of the chassis (see Figure 1). To maintain the SCB, follow these 
guidelines:
„ Check the LEDs on the SCB faceplate. The green LEDs labeled 
ACTIVE
 and 
RUN
 blink 
periodically when it is functioning normally. For more information, see “SCB 
Components” on page 13.
„ Issue the CLI 
show chassis scb
 command to check the status of the SCB. As shown in the 
sample output, the 
Uptime
 field reports how long the SCB has been functioning:
user@host> show chassis scb
SCB status:
 
 Temperature                 26 degrees C / 78 degrees F
 
 CPU utilization              2 percent
 
Interrupt utilization        0 percent
 
 Heap utilization            16 percent
  
Buffer utilization          44 percent
  
Total CPU DRAM              64 MB
Internet Processor II          Version 1, Foundry IBM, Part number 9
  
Start time:                    2003-05-22 11:43:46 PDT
  
Uptime:                        4 days, 4 hours, 11 minutes, 15 seconds
For further description of the output from the command, see the JUNOS Internet Software 
Operational Mode Command Reference: Protocols, Class of Service, Chassis, and Management.
Replace the SCB
The SCB is hot-pluggable, as described in “Field-Replaceable Units (FRUs)” on page 4. When 
the SCB fails or is removed from the chassis, forwarding halts until it is replaced and 
functioning again.
1007