Juniper CBL-M40-PWR-AU ユーザーズマニュアル

ページ / 268
Site Preparation Checklist
M40 Internet Router Hardware Guide
54
Site Preparation Checklist
The checklist in Table 18 summarizes the tasks you need to perform when preparing a site 
for router installation.
Table 18:  Site Preparation Checklist
Item or Task
Performed By
Date
Notes
Verify that environmental factors such as 
temperature and humidity do not exceed router 
tolerances. 
Measure distance between external power sources 
and router installation site.
Select the type of rack.
Plan rack location, including required space 
clearances. 
Secure rack to floor and building structure.
Acquire cables and connectors.
Locate sites for connection of system grounding.
Calculate power budget and power margin.