Sanyo sanups e11a102a ユーザーズマニュアル

ページ / 46
 
− 18 − 
 
8. Preparations Before Operation 
 
Check the following items before starting operation:
 
 
  Visually inspect the UPS to verify that there is no visible damage. 
  Check that the UPS is connected to a utility power source that meets the input 
specifications.  
  Check that the input switch    MAIN SW    is set to “OFF”. 
  Check that load devices are connected correctly.   
  Check that none of the connections is loose.
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
BATT
EXT.
MAIN SW
,  ⑤Check input   
power source
 
,  ⑤Check load 
connections. 
 
Switch is “OFF”.