Vulcan Materials vk series 1vk85c ユーザーズマニュアル

ページ / 29
VK SERIES GAS FRYERS 
VULCAN-HART                                                                                                               F-32971 Rev. F (December  2011) 
-5-
 
 
INSTALLATION 
 
Do not use the door or its handle to lift the fryer.  
 
Before installing the fryer, verify that the type of gas (natural or propane) agrees with the 
specifications on the fryer data plate, which is located on the inside of the door panel.  
Make sure the fryer is configured for the proper elevation. 
 
Record your fryer model, device, and serial numbers for future reference in the space 
provided below.  This information can be found on the fryer data plate. 
 
Fryer Model No: ___________________________ 
 
Device: ___________________________________ 
 
Serial No: ________________________________ 
 
Clearances 
 
 
Minimum clearance from combustible construction: 
 
6” (15 cm) from the sides of the fryer 
6” (15 cm) from the back of the fryer 
The fryer may be installed on combustible floors 
 
 
Minimum clearance from noncombustible construction: 
 
0” from the sides of the fryer 
0” from the back of the fryer 
 
 
Between the fryer and any open-top flame units: 
 
16” (41 cm) 
 
 
Allow space for servicing and operation. 
 
Location 
 
 
Install fryer in an area with sufficient air supply for gas combustion. 
 
 
Do not obstruct the flow of combustion and ventilation air. 
 
 
Provide adequate clearance for air openings into the combustion chamber. 
 
 
Do not permit fans to blow directly onto fryer. 
 
 
Keep the fryer area free and clear from combustibles. 
 
 
Avoid wall-type fans, which create cross-currents within a room.  Avoid 
 open windows next to sides or back.