uline clrco2175 ユーザーズマニュアル

ページ / 19
U-Line Electrical / Plumbing Specfications
13
Factory-Installed Drain Pump
If your drain line will run up to a stand pipe, disposal or spigot 
assembly, or does not otherwise meet the requirements for a 
Gravity Drain, you may have ordered the CLR2160 or 
CLRCO2175 with a U-Line P60 Drain Pump. See Below for typical 
installations requiring a Drain Pump. If you need to install a P60 
Drain Pump into your unit, see Locally-Installed Drain Pump on 
Page 14.
Typical Installations Requiring a Drain Pump
IMPORTANT
IMPORTANT
Before installing your U-Line CLR2160 or CLRCO2175 
with Factory-Installed U-Line P60 Pump, it is extremely 
important to check and test all hose connections at the 
drain pump. There is a possibility that hose connections 
may have loosened during shipment.
To check and test hose connections:
1. Make certain the unit is not plugged into an electrical outlet.
2. Carefully push the power cord grommet through the hole in the 
back panel.
3. Remove 12 screws and back panel.
IMPORTANT
IMPORTANT
Back panel serves as a guard. DO NOT put your hands 
inside the ice maker cabinet or attempt to touch any 
components except the discharge tube during testing.
4. Check that the clamps and hose connections are tight at the 
following areas:
• Discharge tube (A)
• Drain tube (B)
• Vent tube (C)
5. Place a suitable container beneath the pump’s discharge tube. 
(The bucket must be able to hold a minimum of one gallon.)
6. Plug the ice maker power cord into a properly grounded, 
polarized electrical outlet.
7. Place the unit into OFF mode by holding power key for 10 
seconds. Not doing this will cause the unit to start the fill cycle 
which will run for 3 minutes.
8. Verify pump operation by pouring one gallon of water into the 
ice storage bin of the ice maker. The pump should energize and 
pump the water into the container.
9. At this time, verify that all tube and clamp connections are tight 
and leak-free. 
10. Unplug unit power cord from electrical outlet.
11. Reinstall back panel.
Cold
Water
Hot
Water
Waste
Waste
Shut-Off
Valve
Stand Pipe
P60 Pump Required
Air Gap
(Optional Hook-Up)
Cold
Water
Hot
Water
Waste
Shut-Off
Valve
Disposal Assembly
P60 Pump Required
Waste
Cold
Water
Shut-Off
Valve
Hot
Water
Air Gap
(Optional Hook-Up)
Y-Branch Tailpiece
P60 Pump Required
Power
Cord
Grommet
Drain
Fitting
Back
Panel
Water
Connection
Screws
Back View
Side View
B
B
A
C
C