Panoramic Power ltd. PAN-1-4 ユーザーズマニュアル

ページ / 10
 
PAN-14 Sensor Installation Guide 
 
Overview 
This user guide explains how to install the PAN-14 sensors.  
 
PAN 14 Current Sensor 
 
 
Current Transpformer (CT) 
Workflow 
Sensor installation consists of the following steps: 
1. 
Map the circuits.  
See Panoramic Power Deployment Tool User Guide. 
2. 
Physically attach the sensors and the CTs to the wires. 
S2 
S1