Culligan International Company 01020553 ユーザーズマニュアル

ページ / 74
Progressive Flow or Parallel Flow
IMPORTANT
Setting the Jumpers for Progressive Flow
For progressive flow to operate properly, the first and last units m­ust 
have the jum­pers set to pins 1 and 2 (see figure at right). All m­iddle 
units should have the jum­pers on pins 2 and 3 (see figure at right). 
The diagram­ below (figure 17) shows duplex connections. Repeat the 
connections on any additional system­s.
Progressive/Parallel Communication Cable 01016327
 
Schem­atic 
12
 11
  CULLIGAN GLOBAL ELECTRONIC CONTROLLER
Schematic
To RS 485 Comm Port
on GBE Circuit Board, #1
CABLE 01016327
To RS 485 Comm Port
on GBE Circuit Board, #2
PARALLEL
Additional communication cable 
connections are used when there 
are 3 or more controls. Connect 
end of 2nd-(01016327) cable
to this connector and other end of 
cable to RS 485 Comm Port on 
3rd GBE Circuit Board.
To Additional Units
 (if necessary)
Com­m­unication Cable 01016327
Jum­per 
Location
Figure 17
Flow Meter
Flow Meter
Unit 1
Unit 2
Jum­per location for 
first and last units 
(end units).
Jum­per location for 
m­iddle units.
1    2    3