Culligan International Company 01020553 Manual Do Utilizador

Página de 74
Progressive Flow or Parallel Flow
IMPORTANT
Setting the Jumpers for Progressive Flow
For progressive flow to operate properly, the first and last units m­ust 
have the jum­pers set to pins 1 and 2 (see figure at right). All m­iddle 
units should have the jum­pers on pins 2 and 3 (see figure at right). 
The diagram­ below (figure 17) shows duplex connections. Repeat the 
connections on any additional system­s.
Progressive/Parallel Communication Cable 01016327
 
Schem­atic 
12
 11
  CULLIGAN GLOBAL ELECTRONIC CONTROLLER
Schematic
To RS 485 Comm Port
on GBE Circuit Board, #1
CABLE 01016327
To RS 485 Comm Port
on GBE Circuit Board, #2
PARALLEL
Additional communication cable 
connections are used when there 
are 3 or more controls. Connect 
end of 2nd-(01016327) cable
to this connector and other end of 
cable to RS 485 Comm Port on 
3rd GBE Circuit Board.
To Additional Units
 (if necessary)
Com­m­unication Cable 01016327
Jum­per 
Location
Figure 17
Flow Meter
Flow Meter
Unit 1
Unit 2
Jum­per location for 
first and last units 
(end units).
Jum­per location for 
m­iddle units.
1    2    3