Radwin Ltd. AMWL1240 ユーザーズマニュアル

ページ / 98
WinLink 1000 Installation and Operation Manual 
Chapter 
 
2  Installation and Setup 
 
Installation and Setup 
2-9 
4.  Alternating between each site, turn each ODU slowly while listening 
to the buzzer beep sequence for the Best Signal sound, until 
optimal alignment is achieved. 
5.  Secure the site A and site B ODUs to the mast/wall. 
6.  Monitor the link quality for about 15 minutes to verify stability. 
 
Buzzer Sequence 
 
 =buzzer on 
 =buzzer off
 
Description 
 
Best Signal so far 
 
Signal quality increased  
 
No change in signal 
 
Signal quality decreased 
 
No air link 
Figure 
 
2-6.  Beeper Sequence for ODU Alignment 
 
Installing the Link 
Installation and definition of all parameters are applied to both sides of 
the link. 
Î
 
To install the link: 
1.  Verify that the management station is properly connected to the 
same LAN as the IDU, and the WinLink 1000 Manager application is 
running. 
2.  In the toolbar, click the Link Installation button. 
The Installation wizard opens, (see 
Figure  2-7
).