IP Mobilenet LLC B64450G25 ユーザーズマニュアル

ページ / 27
 
SECTION 3:  PRODUCT SETUP AND PRELIMINARY TESTING
 
 
 
637246.DOC  
Page 
9
 
Preliminary Testing 
 
This section provides a functional preliminary test for the base station prior to installation.  It is used to 
determine the condition of the new base station prior to placing into service.  If the base station is non-
functional after completing this test, refer to Chapter 6: Customer Support. 
 
 
This section applies to all base station frequency ranges. 
 
 
Checklist of Required Material 
 
The following checklist provides a list of tools required to perform this preliminary test procedure. 
 
TABLE 4: CHECKLIST OF REQUIRED EQUIPMENT FOR PRELIMINARY TESTING OF A BASE 
STATION 
Calibrated Base Station System – Consisting of the following components: 
(1)  Frequency appropriate IPSeries Base Station 
(2)  Desktop or laptop configured as an Internet Protocol Network Controller (IPNC) 
(3)  Corresponding IPSeries Mobile Radio tuned to Base Station frequencies (i.e.: if an 
IPB138 base, use IP138 mobile) 
(4)  Desktop or laptop with two (2) available serial ports with Microsoft Windows 98 or 
higher, IPMobileNet Dial-Up Networking, IPMessage software, and HyperTerminal for 
base station installed 
(5)  Base Station power cable 
 
DC power supply with ammeter, with the appropriate volts, see page 7 Current Consumption 
for each base station (Astron VS12M or equivalent) 
 
Six (6) antennae (generic mag mounts) tuned to frequency of transceiver 
 
Serial Base Station Interface 
No. Requirement 9 
DB9 RS232 serial cable 
 
IPTurbo Converter (IPMN p/n: 900.00012.01) 
 
IPTurbo Converter Reference Manual (IPMN p/n: 516.80496.REF) 
 
Ethernet Base Stations Interface 
No. Requirement 9 
Ethernet RJ45 Cable 
 
Ethernet Cable