Hughes Network Systems 24SX-001 ユーザーズマニュアル

ページ / 181
1027144– 0001  Revision D
Commissioning the RT   7–13
RT installation
Return to the IDU location to verify that the RT has acquired the
HT:
1.
Observe the CCM LCD to verify that the RT has
successfully acquired the HT frequency.
The following display indicates that the RT has successfully
acquired the HT.
Install 
Acq Ack: HT nnn
nnn = HT ID
Note:
 The LCD will display 
Acq Deny
 (acquisition
denied) if:
The RT’s ESN has not been entered in the EMS
database, or
The RT is pointed toward the wrong HT.
Specify the appropriate attenuator value, and then take the IDU
out of Install mode:
1.
Scroll to the attenuator option:
Install
Mech Attn
2.
Scroll to the attenuator selection display:
Mech Attn
20 dB
3.
Scroll until the LCD shows the size of the installed
mechanical attenuator. If no attenuator is installed, select 
0 dB
. Press ENTER.
4.
Take the IDU out of Install mode: Select 
Exit
 and press
ENTER.
Install
Exit
7.5
Verifying HT
acquisition
7.6
Entering an
attenuator value