Itron Inc. 100GDLCN ユーザーズマニュアル
Elster American and Itron Actaris Commercial Meter Installation
TDC-0823-005 100G Datalogging Installation Guide - Direct Mount
59
Proprietary and Confidential
5. Place the index cover mounting plate on the 100G Datalogging commercial gas endpoint so the printing
"FLOW FRONT AL800 AL1000 AL1400 AL2300 AL5000 TURBINE ROTARY" stamped on the plate
is toward the front of the meter. (A gap between the mounting plate and meter at the screw locations is
normal.)
is toward the front of the meter. (A gap between the mounting plate and meter at the screw locations is
normal.)
6. Install four mounting screws included with the 100G Datalogging commercial gas endpoint and tighten
them in an alternating diagonal sequence.
For metal mounting plates with a flat screw surface, use endpoint mounting screws with internal tooth
washers.
For plastic mounting plates with tamper screw cups, use endpoint mounting screws (Use O-rings AS-
568A-011, 5/16" ID x 7/16" OD for a maximum moisture seal). Turn each screw 1/4 to 1/2 turn after it
contacts the mounting plate.
contacts the mounting plate.
If you have access to a torque driver, tighten mounting screws to 72 inch-pounds.
7. Place new tamper seals over screws (if mounting plate has tamper seal cups) and press into place with an
11/32" nut driver or similar blunt tool.