VeriFone 1619-20XPL ユーザーズマニュアル

ページ / 37
 
 
CONFIDENTIAL 
Version A 
Page 6 of 37 
MasterCard® PayPass™ Contactless Transit Pilots 
Installation Guide 
 
 
2.5
 
Upgrade Process 
References  annotated  [value]  in  this  section  are  to  the  assemblies  /  items  defined  in 
section 2.2. 
2.5.1
 
Stage 1 – Remove Existing Phase 1 Hardware 
The first stage of the upgrade is to remove the existing phase 1 solution. 
2.
 
Open the top of the turnstile to reveal the phase 1 installation, as shown. 
 
 
3.
 
Power down the terminal by unplugging in the 3-Pin plug.