Unique Broadband Systems Ltd. DRU2KW ユーザーズマニュアル

ページ / 64
Page 21
X75 SERIES - Mk3 Controller
INSTALLATION & OPERATING MANUAL
Manual No. x75mk3-11
x75-man-Rev11-0815.indd
 
One by one, turn each output circuit breaker to the ON position and/or insert a GMT 
fuse and measure the DC voltage across the corresponding output terminals.  The 
voltage should again read approximately 54.4, 27.2, or 13.6 volts.  After each output 
is measured, turn OFF that circuit breaker and/or remove the GMT fuse and turn 
ON and/or insert a fuse in the next one. After measuring the last circuit, turn off that 
breaker and/or remove the GMT fuse and make sure that all output breakers are in 
the OFF position and/or all fuses are removed.
 
Unplug or disconnect the AC input power source.  Before touching any terminals 
wait 5 minutes for the internal storage capacitors to discharge.
12.3  Controller Section Operation and Settings
 
At this point, before the final installation connections, read section 13 covering 
Controller setup.  Next, make any required signal connections, controller adjustments, 
temperature compensation adjustment and alarm enabling settings.
 
WARNING: Remember to take precautions each time the system is turned on and also 
when connecting or disconnecting the battery.  Remember that the battery presents 
an energy hazard at its terminals. Also remember to allow 5 minutes for internal 
capacitors to discharge after disconnecting the AC input power and the battery.
12.4  Connection to Loads
 
With input AC power unplugged, the battery disconnected and no other power sources 
connected to the loads, make sure that all load circuit breakers are set to the OFF 
position and/or all GMT fuses are removed.
 
Connect load wires to each set of output terminals, one at a time.  Note that the front 
panel breaker and fuse numbers directly correspond to the output terminal numbers.  
 
 
Be sure to connect the polarities correctly.
12.5  Connection to Battery
 
WARNING: Improper polarity of the battery connection may damage the power 
system. Take precautions when installing the battery and note that the battery cables 
are “hot” (live) and present an energy hazard.
 
With AC input unplugged, remove the three rectifier modules from the system chassis. 
Make sure all load circuit breakers are in the OFF position and/or all GMT fuses 
removed.  Set the battery circuit breaker to the OFF position.  Carefully connect the 
battery cables to the battery terminals shown in Figure 4 while observing the correct 
polarity as described in section 9.4.