Gossen Metrawatt M817S Mains-analysis device, Mains analyser M817S データシート
製品コード
M817S
C-1
A P P E N D I X C
Battery Specifications and Replacement Procedure
Overview
Introduction
The internal battery pack used in Energy Platform functions as the primary power
source and UPS. Always charge the battery fully before using the unit. The Energy
Platform will fully charge its internal battery in six (6) hours.
Energy Platform uses a non-volatile flash memory for backup that is not operator
replaceable. The flash memory will store data temporarily.
In this appendix The following topics are covered in this appendix.
Topic
See Page
Battery Specifications
C-2
Battery Pack Safety Precautions
C-3
Battery Pack Replacement
C-4