Zoeller AQUANOT 585 ユーザーズマニュアル

ページ / 8
5
BATTERY
RED LEAD
TO POSITIVE(+)
TO NEGATIVE(-)
BLACK LEAD
SWITCH
CUT AWAY OF SUMP PIT
RED LEAD
TO POSITIVE(+)
MOTOR
CHARGER
NEGATIVE(-)
BATTERY TERMINAL
BATTERY TERMINAL
POSITIVE(+)
OUTLET
ALARM
BLACK LEAD
TO NEGATIVE (-)
© Copyright 2009 Zoeller Co. All rights reserved.
 STEP 
Electrical Connections for Model 585
  Note: This Step is for the 
Aquanot
®
 
II (Model 585). Proceed to STEP 5 
for installation of 
Aquanot
®
 
I (Mod el 580).
  4.1)  Complete electrical connections as shown in Fig ure 4.1.
  4.2)  Proceed to STEP 6.
  Do not place battery or charger directly on ground. If the 
battery or charger must be placed directly on the ground, then place a 
piece of wood between the units and the ground. Do not put the charger 
on top of the battery.
Figure 4.1
 STEP 
Electrical Connections for Model 580
 5.1) Complete the electrical connections as shown in Figure 5.1.
  Do not place battery or monitor directly on ground. If 
the battery or monitor must be placed directly on the ground, then 
place a piece of wood between the units and the ground. Do not 
put the battery monitor on top of the battery.
Figure 5.1
 STEP 
Testing of Pump Operation
  6.1)  Unplug the primary pump so that it does not start.
  6.2)  Fill pit with water until the 
Aquanot
®
 starts.
  6.3)  Verify that the pump starts and stops at the desired on/off points.
  6.4)  Verify that there are no leaks in the discharge line.
  6.5)  If adjustment is necessary, raise or lower the appropriate stop(s) according to STEP 2.
  IMPORTANT: Spacing between upper and lower stops determine amount of water removed from pit.
 6.6) If the pump is not operating properly after following the above steps, refer to the Troubleshooting guide on page 8.
 6.7) When 
fi nished testing plug primary pump back into AC receptacle.
 STEP 
Installation of the Discharge Piping
  3.1)  Assemble the discharge pipe into the pump as shown in Figure 3.1.
  IMPORTANT: In order for this installation to work properly, a check valve 
must be installed onto the discharge line.
 P/N 
30-0100
 P/N 
30-0101
 P/N 
30-0102
 P/N 
30-0103
Figure 3.1
SK1784
SK1783
SK1778
Recommend the following Zoeller check valves:
Some local codes require union check with ball valve.
}
PRIMARY PUMP
DISCHARGE
MAIN
CHECK VALVE
LINE
PRIMARY PUMP
CHECK VALVE
DISCHARGE
LINE
MAIN
OR