12 - NORMAL SEQUENCE OF OPERATION
13 - GENERAL INSTRUCTIONS
Thermostat actuates on call for heat, 
completing circuit to control. Completed 
circuit to control will first activate circulator 
and damper which will close end switch inside 
damper. Completes circuit to ignition system, 
ignition takes place.
In event boiler water temperature exceeds 
high limit setting on boiler mounted high limit 
control, power is interrupted between control 
system and ignition system. Power remains 
off until boiler water temperature drops below 
high limit setting. Circulator continues to 
operate under this condition until thermostat is 
satisfied. 
In event flow of combustion products through 
boiler venting system becomes blocked, blocked 
vent safety switch shuts main burner gas off. 
Similarly, if boiler flue-way becomes blocked, 
flame rollout safety switch shuts main burner 
gas off.  Figure 16.  If either of these conditions 
occur, DO NOT ATTEMPT TO PLACE BOILER 
BACK INTO OPERATION. CONTACT 
CERTIFIED SERVICE AGENCY. 
Blocked Vent 
Safety Switch
Rollout Switch 
4 Section Boiler
Rollout Switch                        
2,3,5                    
Section Boiler
Intergral Draft 
Hood
Base
Burner 
Door
Burners
Orifices
Jacket Base 
Panel
Before seasonal start-up, have a certified service agency 
check boiler for soot and scale in flues, clean burners and 
check gas input rate to maintain high operating efficiency.
WARNING
Label all wires prior to disconnection when servicing 
controls. Wiring errors could cause improper and 
dangerous operation.
!
  
Verify proper operation after servicing
Service agency will verify system is filled with water to 
minimum pressure and open air vents, if used, to expel any 
air accumulated in the system. Check entire piping system 
and, if any leaks appear, have them repaired.
Circulators need to be checked and maintained. 
Refer to circulator manufacturer's instructions.
Inspect venting system at the start of each heating 
season. Check vent pipe from boiler to chimney for signs of 
deterioration by rust or sagging joints. Repair if necessary. 
Remove vent pipe at base of chimney or flue and using a 
mirror, check vent for obstruction and verify vent is in good 
working order.
Boiler flue gas passageways may be inspected by a light 
and mirror. Remove burner door. Figure 17. Place trouble 
lamp in flue collector through draft relief opening. With 
mirror positioned above burners, flue gas passageways can 
be checked for soot or scale.
This procedure should be followed to clean flue gas 
passageways:
1. 
Remove burners from combustion chamber by raising 
burners up from manifold orifices and pulling toward 
front of boiler. Figure 19.
2. 
Disconnect vent pipe from draft hood.
3. 
Remove top jacket panel.
4. 
Remove combination flue collector and draft hood from 
boiler castings by loosening nuts on hold down bolts 
located on each side of collector. Figure 17.
5. 
Place sheet of heavy paper or similar material over 
bottom of base and brush down flue passageways. Soot 
and scale will collect on paper and is easily removed 
with the paper. 
6. 
With paper still in place in base, clean top of boiler 
castings of boiler putty or silicone used to seal between 
castings and flue collector. Verify chips are not lodged 
in flue passageways.
When cleaning process is complete, restore boiler 
components to their original position. Use IS-808 GE 
silicone (available from distributor) to seal around flue 
collector and boiler castings.
Figure 17 - Blocked Vent Safety Switch, Roll-out 
Safety Switch