Utica Boilers UB90-100 インストール手順

ページ / 72
10
Natural Gas
LP
MBH
CO
2
CO
MBH
CO
2
CO
50
8.7- 9.7
< 100
50
10.0 - 11.1
< 100
75
8.7- 9.7
< 100
75
10.0 - 11.1
< 100
100
8.7- 9.7
< 100
100
10.0 - 11.1
< 100
Table 1 - Manufacturer Settings
14.  Install top boiler panel.
15.  Turn on electric and gas to boiler
16.  Resume operation using OPERATING 
INSTRUCTIONS found on Operating Instructions 
label on boiler or in Installation, Operation & 
Maintenance Manual.
17.  Verify proper operation by following START 
UP PROCEDURE in Installation, Operation & 
Maintenance Manual.
18.  Verify Combustion:
A.  Adjust gas pressure for optimal A/F ratio. 
Gas pressure and fl ow will be lower after kit 
installation. Refer to table 1 for combustion 
settings.
B.  Install adjustment screw and cover. Verify 
settings.
C.  Operate boiler thru several cycles after setting 
the gas pressure to verify ignition quality.
19.  Attach upgrade label next to rating plate. See 
fi gure 23.
20.  Install front jacket panel(s).
Figure 23 -  Label Placement 
HSI Installation