Utica Boilers UB90-100 インストール手順

ページ / 72
9
HSI Installation
Figure 21  Pressure Tube Routing
12.  Connect pressure tubes: See fi gure 21.
A.  Site glass - run tube over gas valve assembly 
and/or piping creating an inverted u-trap. 
Translucent silicone tubing coming from a tee.
B.  Gas valve - reference port. Clear silicone tube 
coming from a cross.
C.  Air intake. Clear silicone tube coming from the 
cross.
13.  Wire junction box internal wires and cover plate. 
See fi gure 19.