Siemens TV Converter Box G120 ユーザーズマニュアル
Automation and Drives - SCE
T I A Training Document
Page 18 of 147
Module
H01
Issued: 02/2008
Frequency Converter SINAMICS G120 on PROFIBUS DP and PROFINET
Preface Notes Startup with PROFIBUS Startup with PROFINET Program Example
3. In the Sizer on the left, the project tree is located with the structure of the drive project; on the
right, ’Workflow’ shows you the steps required to set up the drive system.
right, ’Workflow’ shows you the steps required to set up the drive system.
4. Now, first click on ’Network’ to view the network data. By clicking on the button '
’, you get to
the dialog for setting the voltage, the frequency, and the number of phases. (
→ Network →
→ Voltage 400V → Frequency 50Hz → Number of phases 3 → OK)