COMMISSIONING PROCEDURE  
 
EVACUATION WITH A VACUUM PUMP  
 
Evacuation removes air, readying the system for charging. 
 
Connect a gauge set to the service access ports. 
 
Connect the gauge center hose to a high vacuum pump.  Start the pump and slowly 
open the suction gauge hand wheel.  As the vacuum drops below 20 inches open both 
hand wheels fully. 
 
EVACUATION LEAK TEST 
 
Evacuate the system to the best vacuum (lowest pressure).  Close the hand wheels to 
the pump.  Observe the vacuum gauge and be sure the pressure remains constant for 5 
minutes.  If the pressure rises rapidly check all the connections again.  Re-evacuate to 
the lowest pressure and test by holding a vacuum with the gauges closed.  Be sure the 
system will hold this vacuum.  Proceed by opening the hand wheels and continuing the 
evacuation process for 30 minutes or more.  A micron gauge can be used to measure 
vacuum.  Proper dehydration and evacuation should be in the range of 200 to 500 
microns.   
  
The evacuation leak check is a preliminary check and is not to be considered a 
system leak check. 
 
NEW SYSTEM CHARGING 
 
INTRODUCING INITIAL CHARGE 
 
After the evacuation leak test and pump down shut off the hand wheels, disconnect the 
center hose from the pump, and connect it to the refrigerant supply.  If the center hose 
does not have a check valve, vent the hose from can tap (refrigerant supply) to the 
gauge body.  With the refrigerant can (12 oz. in the inverted (liquid) position, open the 
discharge hand wheel and feed in about 1/2 of a can of refrigerant (6 to 8 ounces).  
Close the hand wheel and begin an inspection of all the connections in the system.   
Begin leak check.  
 
 
LEAK CHECKING 
 
Leak checking is a very important step that should be done with diligence.  A leak 
will cripple this system.  Please take the time needed to be sure all connections are 
tight.  Check every connection even the ones that were pre-made in manufacture.