Rhinotek 1640 ユーザーズマニュアル

ページ / 102
OPERATION
1640-1645   01/11
Operation Section 4-33
© 2011 Alamo Group Inc.
OPERA
T
ION
BACKFILLING
Approach pile with a level bucket.
Poor methods actually move no more dirt and make
it more difficult to hold a level grade.
Do not use bucket in dumped position for
bulldozing. This method, shown above, will impose
severe shock loadings on dump linkage, bucket
cylinder and tractor.