Installation
All plumbing must conform to local codes. Inspect the 
unit carefully for carrier shortage or shipping damage.
Location Selection
The following considerations must be taken into 
account when selecting the location for the water 
conditioning system.
Locate the system as close to a drain as possible.
If supplementary water treating equipment is 
required, make sure that adequate additional 
space is available. Locate the brine tank in an 
accessible place so that salt can be easily added.
Do not install any unit closer than 10 feet (3 m) of 
piping between the outlet of the conditioner and 
the inlet of a water heater. Water heaters can 
transmit heat back down the cold water pipe into 
the control valve. Hot water can severely damage 
the conditioner.
A 10-foot (3-m) total pipe run (including bends, elbows, 
etc.) is a reasonable distance to prevent hot water 
damage. A positive way to prevent hot water from 
flowing from a heat source to the conditioner is to 
install a check valve in the soft water piping from the 
conditioner. If a check valve is installed, make sure that 
the water heating unit is equipped with a properly rated 
temperature and pressure safety relief valve. Always 
conform to local codes.
Do not locate the unit in an area where the 
temperature ever falls below 34
o
F (1
o
C) or over 
120
o
F (49
o
C).
Do not install the unit near acid or acid fumes.
Do not expose the unit to petroleum products.
Water Line Connection