Vogelzang International NORSEMANTM SOlid FuEl WARM AiR FuRNAcE 2500 ユーザーズマニュアル

ページ / 28
Page  
NORSEMAN™ 1500/2500 FuRNAcE
 
VGZ-018 / 0805.1
AssEMblY iNstRUctioNs
Yo u r   N O R S E M A N ™   Wa r m   A i r   F u r n a c e  
requires the following items to be assembled or installed 
by the furnace installer:
Feed Door Pull Handle/Thermostat Assembly
Feed Door Locking Handle
Blower(s) and Blower control
Electrical connections
1.  Remove  all  parts  from  inside  the  furnace  and 
inspect  for  damage,  including  the  firebrick  as 
some  breakage  could  occur  during  shipment. 
Do  not  operate  furnace  with  broken  or  miss-
ing  fire  box  bricks.  Replace  damaged  bricks  
before operating furnace.
2.  Assemble the feed door pull handle as shown in 
figure 4. Install thermostat assembly and cover as 
shown.
3.  Align thermostat control knob with flat on thermostat 
control shaft and press onto shaft (figure 4).
4.  Attach  feed  door  locking  handle  as  shown  in  
figure 5 with screws and nuts provided. 
 
Note: Slotted holes are for adjustment of handle. 
Adjust handle until pressure is required to lock feed 
door.
5.  Install  Blower/Limit  control  on  rear  of  furnace 
cabinet as shown in figure 6 using three (3) sheet 
metal screws.
6.  Remove blower(s) from carton(s). Attach the flex-
ible conduit/wire assembly to the blower(s) before 
mounting. 
7.  Remove junction box cover and take out the mount-
ing hardware package. Position clip nuts to furnace 
housing around blower opening as shown in figure 
6. On Model #2500, install the right (when facing 
rear  of  furnace)  blower  first.  Install  the  blower(s) 
with gasket using 1/4-20 x 3/4˝ bolts.
8.  Secure the 4 inch square electrical junction box to 
the black bracket on the rear of the stove using two 
(2) sheet metal screws.
9.  Wire blower according to the wiring diagram shown 
in figure 7/8. On model 2500, wire right side blower 
first (see figure 7). Replace junction box cover when 
complete.
10.  check operation of shaker grates with grate handle 
before loading fuel in furnace.
Fig. 4 – Door/Handle/Thermostat Assembly
Fig. 5 – Feed Door Handle Assembly
Fig. 6 – Blower Assembly