7. INSTALLATION 
7.1  BENCH SPACE. 
7.1.1.  The Charger-Analyzer system occupies 19" x 17" (48.3 cm x 43.2 cm) of table 
top space for the charger and 10" x 25" (25 cm X 63.5 cm) for the Temp-Plate. 
7.1.2.  Allow also at least 6" (15.2 cm) of separation from the wall and adjacent 
equipment, in order to maintain proper air flow (VITAL!). 
7.1.3.  NOTE 1: In non air-conditioned rooms or if other heat dissipating equipment are 
nearby, it is recommended that circulating or extracting fans be used to aid in the 
heated air removal. 
7.1.4.  NOTE 2: Operation in dusty or otherwise "dirty" air environments will severely 
reduce the cooling capacity of the fans and lead to premature failure. 
 
7.2  LINE VOLTAGE. 
7.2.1. 
Connect the unit to a wall receptacle NEMA 6-30R, 230V (re-wire the 
transformers input for 240V or 208V operation) with a 30 AMP capacity. This 
line must be a dedicated line, originating at the breakers box and must be 
protected with a motor load rated circuit breaker. Sharing of the line with other 
equipment may result in erratic operation of the Charger-Analyzer and the other 
devices connected to the same line.
 
7.2.2.  NOTE: Operation of this unit with a "soft" line or with a line voltage 10% above 
or below the nominal 208/230/240VAC will result in erratic operation and may 
also lead to equipment damage if large voltage surges occur. 
7.2.3.  Power (Mains) Wiring Diagram 
 
Figure 3 - Line Voltage Wiring, 115V