Zephyr ZGEE30AS290 オーナーマニュアル

ページ / 49
10
www.zephyronline.com
Installation – 
Installing the Hood 
WARNING: Electrical wiring must be done by a qualified person(s) in accordance with all applicable codes and
standards. This range hood must be properly grounded.  Turn off electrical power at service entrance before wiring.
!
1) Prepare electrical wiring and ducting in cabinet.  Location of junction box and blower outlet can be found on page 8.
2) Unscrew the (10) screws from front panel and place                           
    the panel aside, Fig.3.  You will now have access to the   
    interrior of the range hood.
Fig.3
Fig.4
3) Open cabinet doors.  Lift range hood and slide it through  
    the opening located in the bottom of the cabinet, Fig.4.   
    Make sure opening matches the dimensions on page 9,  
    Fig.1.
4) There are spring clips located on the left and right sides  
    of the hood body which will temporarily hold the hood in  
    place, Fig.5.
Fig.5
Fig.6
5) Secure upper brackets to left and right sides of hood  
    body by using (2) 3/16 x 3/8” screws for each bracket.   
    Fig.6.  Make sure the (2) captive nut screw holes on  
    the bracket are facing downward. Note: Due to limited  
    workspace in 30” cabinets you will need to use a right  
    angle or 2” long Philips head screwdriver.
1
2