Zephyr COKE48BRGX マニュアル

ページ / 10
www.zephyronline.com
3
In
st
al
la
ti
o
n
 -
 
E
xt
er
n
al
 B
lo
w
er
1. Remove and discard shipping brackets and wood support (attached to sides of motor and inlet collar). Fig. - 7
BEFORE INSTALLING, check to see if blower wheel turns freely and does not rub on motor brackets. Check damper door
to be sure it moves freely and spring returns door to closed position. 
2. Provide 14” x 18” hole through the roof or wall as shown in Fig. - 2. For reference, location of 10” duct connection and 
wiring connection is shown.
Fig-2
Fig-3
Fig-5
Top View
Down Slope
of
Roof or Wall
14"
18"
4 1/2"
24"
30"
6"
2"
1 1/2"
24"
Remove
Fig-7
Fig-1
Remove
10" Elbow
10" Elbow
Roof
Hood
Hood
Outside Wall
10" Duct
10" to 8"
Transition Adapter
10" to 8"
Transition Adapter
Remove
Remove
TYPICAL INSTALLATION
T
N
U
O
M
 L
L
A
W
 
E
D
I
S
T
U
O
T
N
U
O
M
 
F
O
O
R
3. Install blower on roof or wall, with discharge 
(screened end) pointing down, according to 
standard 
 procedures.
NOTE:  Front discharge edge should be on top
of shingles and rear and side edges under shingles.
Unit must be sealed between roof or wall and under
side of 
 with 
 mastic to prevent  leaks.
For installation on a 
 roof, or roofs with pitch 
of less than 1 1/2’ in 12”, install blower on curb 
as shown in Fig. - 3. Position curb on sloping roof 
with 2” dimension facing down slope. Position curb 
on 
 roofs so that disc harge points away from 
prevailing wind.
Fig-2
Fig-4
Top View
Down Slope
of
Roof or Wall
10" Adjustible Elbow
Shingle Over Flashing
Shingle Under Flashing
Screw and Tape Joint
10" Diameter Duct
Conduit
14"
18"
4 1/2"
7 3/4"
10 1/2"
1 1/2"