Zephyr ZSIE36ASES 使用とお手入れ

ページ / 36
9
1.  Measure from range top to hood bottom and mark line A.  
´PLQLPXPIURPUDQJHWRS 
2.  Plum and mark center line.
 0DUNPRXQWLQJKHLJKWOLQH% ´IURPOLQH$
0DUNPRXQWLQJKHLJKWOLQH& ´IURPOLQH$
5.   Mark mounting spread from C/L on line B 12-3/4”
6.  Mark mounting spread from C/L on line C 9-7/16” 
 )DVWHQ  0[´VFUHZVLQWRVWXGVRQOLQH&'RQRW
fasten screws all the way. Note: wood blocking may need 
to be added behind the drywall if no studs are present.  
Wall anchors may also be used but check local codes 
for compliance. Failure to use suitable wall anchors 
and screws to hold the weight of the hood could result 
in personal injury or damage to cooking surface or 
counter.
8.   Install 8” round duct collar with backdraft damper to top of 
ERG\RIKRRGE\  0[ÀDWVFUHZV
 +DQJKRRGRQWRVFUHZVDQGKDQGWLJKWHQ ),*$ 8VH
 0[´VFUHZVWRIXUWKHUVHFXUHWKHKRRGWRWKHZDOO
from inside the hood on line B.
10. Center and attach duct cover bracket to wall below ceiling  
RUVRI¿WXVLQJ  0[´VFUHZV
11.  Install electrical.
12. *Install duct work and duct tape.
13.  Power up hood and check for leaks around duct tape.
14.  Place telescopic duct covers onto hood and extend inner  
WRS GXFWFRYHUXSZDUGVDQGVHFXUHWRGXFWFRYHUEUDFNHW
XVLQJ  0[VFUHZV
                                  
    
A
B
C/L
13-1/8"
9-7/16"
C/L
26" min
Duct Cover
 Bracket
C
12-3/4"
1-
5/
16"
C
B
CAUTION: At least two installers are
required due to the weight and size of the
hood.
!
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.
!
Installation – 
Mounting the Hood
FIG. A