Zephyr ZTEE30AS 入門ガイド

ページ / 21
Installation – 
Mounting the Range Hood
13
1.  Select preferred duct location (vertical or 
horizontal) if ducting out of kitchen.  Refer to 
page 10 for details.
2.  Install utensil bar to hood. Refer to page 12 for 
details.
3.  Begin installation by removing the mesh fi lters.
4.   Reinforce cabinet with 1”x2” wood strips 
if additional strengthening is required or if 
cabinets are framed.
5.  Temporarily position the range hood in the 
desired mounting location. Measure and 
mark the mounting holes, duct and electrical 
locations with a pencil.
6.  Drill/cut out the required openings for duct and 
electrical access; make sure the duct opening 
is large enough to apply duct tape.
7.  Fasten hood onto cabinet with (4) M4 wood 
screws provided.
8. Install 
electrical.
9.  Install duct work and seal with duct tape.
10. Reinstall mesh fi lters.
11. Power up hood and check for leaks around 
duct tape.
12. If recirculating the hood refer to page 11 for 
more details.
Hood is designed for installation under a 
kitchen cabinet
9. Aluminum duc
  tape
6. Duct
opening/
cutout
4. Add 1”x2” 
wood strips
2. Mesh
filters
8. Electrical
Fig 3