Thermo Products CBD1-50N ユーザーズマニュアル

ページ / 57
All installations and services must be performed by qualified service personnel. 
 
 
 
 
INDEX 
 
SECTION 
 
 
 
 
 
 
 
 
BEGINNING PAGE 
 
I. 
SAFETY INFORMATION 
 
 
 
 
 
 
II. 
FURNACE SPECIFICATIONS 
 
 
 
 
 
 
III. 
GENERAL INSTALLATION 
 
 
 
 
 
 
 
A.  CODES AND CLEARANCES   
 
 
 
 
 
 
B.  FURNACE LOCATION 
 
 
 
 
 
 
 
B1.CDB1 HORIZONTAL APPLICATION   
 
 
 
 
 
C.  REPLACING EXISTING FURNACE FROM A COMMON VENT  
 
 
D.  GENERAL REQUIREMENTS FOR VENTING CHB1/CDB1 
 
 
 
E.  SIDEWALL VENTING 
 
 
 
 
 
 
11 
 
E1.  SINGLE PIPE (SIDEWALL) VENTING OPTION 
 
 
 
14 
 
F.  INSTALLATION OF OUTSIDE VENT/AIR INTAKE TERMS. 
 
 
14 
 
G.  CONNECTING FURNACE TO ROOF VENT/AIR TERMS. 
 
 
16 
 
H.  CONNECTING FURNACE TO VENT/AIR INTAKE TERMS. 
 
 
17 
 
I.  CONDENSATE DRAIN LINE & TRAP ASSY.   
 
 
 
22 
 
J.  GENERAL GAS PIPING 
 
 
 
 
 
 
25 
 
J1.  REQUIREMENTS & SIZING OF DUCTWORK  
 
 
 
26 
K.  FILTERS 
 
 
 
 
 
 
 
 
29 
 
L.  WIRING 
 
 
 
 
 
 
 
 
31 
IV. 
STARTING THE UNIT   
 
 
 
 
 
 
34 
 
A.  SEQUENCE OF OPERATIONS 
 
 
 
 
 
34 
 
B.  INITIAL START-UP   
 
 
 
 
 
 
36 
 
C.  ADJUSTMENT OF BTU INPUT RATE  
 
 
 
 
36 
 
D.  BURNER ADJUSTMENT 
 
 
 
 
 
 
37 
 
E.  FURNACE CHECKOUT PROCEDURE  
 
 
 
 
38 
VI. 
INSTALLER’S INSTRUCTIONS TO USER 
 
 
 
 
39 
VII.   
TROUBLESHOOTING   
 
 
 
 
 
 
40 
 
APPENDIX – A   
REPLACEMENT PARTS LIST 
 
 
 
 
46 
 
APPENDIX – B   
WIRING DIAGRAMS 
 
 
 
 
 
50