Vermont Casting 2468 사용자 설명서

다운로드
페이지 28
9
Dutchwest Natural Vent Gas Heater
30002008
ST671
attach snapstat
Snapstat
Left Air Duct
ST671
Fig. 12  Install the snapstat and connect the extension wire 
terminals. View is with top removed, however, access is 
available through the rear when installing fan before gas line 
connection.
9.  After sliding the firebox in place, the rheostat control 
switch attaches to the left side of the valve bracket 
at the front of the stove. (Fig. 13)
• 
Remove the plug from the rheostat bracket. 
• 
Insert the switch box shaft through the hole in the 
back of the right side of the valve bracket, align-
ing the locator pin with the smaller hole in that 
bracket.
• 
Attach the control knob to the rheostat shaft.
• 
Use the wire tie to secure the fan and rheostat 
wire harnesses together.
10. 
Plug the power cord into a standard grounded 
110 volt household outlet. If the fan control knob is 
not turned to the OFF position, the fan will turn on 
when the temperature at the snapstat reaches ap-
proximately 109°F.
MOTOR
SNAPSTAT
ON/OFF
RHEOSTAT
WHT
WH
T
BLK
BLK
BLK
GR
N
BLK
POWER
ST196
FK26 fan diangram
11/99
ST196
Fig. 14  #2767 / FK26 fan wiring diagram.
ST758
Dutchwest
attach rheostat
5/15/03   djt
Retaining Nut
Control Knob
ST758
Fig. 13  Attach rheostat to left side of valve.
Rheostat
Venting System Assembly
The venting collar is on the sheet metal draft hood/heat 
exchanger assembly, over the firebox. Use a B-vent 
adapter, from the same maker as the rest of the B-vent 
components, to join the first section of venting to the 
draft hood.
The stove includes a spill switch. Operating this stove 
when not connected to a properly installed and main-
tained venting system, or tampering with or disconnect-
ing the spill switch, can result in carbon monoxide (CO) 
poisoning and possible death.
The stove includes a bracket for installing decorative 6”  
(150mm) round stove pipe around the B-vent, for ap-
pearance purposes only. The decorative pipe need not 
be concentric with the vent pipe.
If the installation includes decorative stove pipe around 
the venting system, make a cardboard template of the 
decorative pipe by tracing its circumference. Put this 
template in the flue recess in the stove top. Position the 
template to fit well against the front of the recess. (Fig. 
16) Use this template to locate the bracket to hold the 
decorative pipe. Depending on spacing, the bracket 
may fit inside the decorative pipe without interfering 
with the vent system. Fasten the bracket to the draft 
hood/heat exchanger assembly with a sheet metal 
screw.
ST777
Dutchwest
nv
decorative pipe
template
6/20/03   djt
Template
Sheet Metal Screw
Bracket
ST777
Fig. 16  Use a template to locate the bracket for decorative 
pipe to surround the B-vent pipe.
Insert the B-vent adapter into the flue collar and drill   
1/8” (3mm) pilot holes through both the stove’s collar 
and the adapter. Attach the adapter to the flue collar 
with sheet metal screws. (Fig. 17)
ST777
Dutchwest
nv
decorative pipe
template
6/20/03   djt
ST778
Fig. 17  Attach the B-vent adapter to the flue.