CFM Corporation UVDR36C 사용자 설명서

다운로드
페이지 16
5
UVDR Series Unvented Gas Fireplaces
20007469
screws are located across the top of the fireplace 
opening approximately 5” to the right and left from 
center. Two (2) screws are located 4” down from 
the top on each side of the fireplace opening. Place 
the canopy, making sure the 1/4” hex head screws 
across the top of the opening align with the clear-
ance holes in the canopy. Secure with the four (4) 
previously removed screws.
WARNING: The firebox canopy must not be modified 
or replaced with a canopy that may be provided with 
the unvented decorative room heater.
4.  Floor Clearances:  No clearance is required if the 
appliance is installed per these instructions.
Installing the Firebox
This list of specific instructions will help you make cer-
tain that every installation operation is done correctly. 
Complete the installation steps in the sequence shown.
LOCAL BUILDING CODES SHOULD BE CONSULTED 
IN ALL CASES AS TO THE PARTICULAR REQUIRE-
MENTS CONCERNING THE INSTALLATION OF FAC-
TORY BUILT FIREPLACES.
Select the location for the fireplace by taking into con-
sideration the factors previously outlined in the Locating 
the Fireplace section of the manual.
Step 1:  Framing the Firebox
The width of the framed opening must be 39” for 36” 
models or 45¹⁄₄" for 42" models. (Fig. 4)
The entire fireplace can be elevated above the floor 
to achieve a raised hearth effect. This can be done by 
adding a small platform to achieve the desired height.
NOTE: Refer to Pre-wiring the Junction Box and Electri-
cal Service on Page 7.
Step 2:  Install the Firebox
Install the firebox into the framed opening by setting 
it directly in front of the opening and sliding it into the 
proper position.
Step 3:  Level the Firebox
Check the level of the firebox on the top edge of the fire-
place face. Shim if necessary.
Step 4:  Secure the Firebox
Four (4) nailing flanges are supplied with the fireplace 
(found on the fireplace hearth). To level the box and 
secure it firmly in place, remove the nailing flanges from 
the hearth and install at the sides of the fireplace as 
shown in Figure 5.
NOTE:  The nailing flanges have two (2) sets of holes 
to allow for adjustment for 1/2” or 5/8” offset of the face 
of the unit. When installing the nailing flanges, choose 
the set of holes on the nailing flange that fit with your 
application. 
42"
5" Min.
9���"
Min.
24"
Min.
10"
FP604a
clearances
2/04
6"
16"
Min.
Combustible Per-
pendicular Wall
3a
Noncombustible 
Material
Fireplace 
Opening
FP604b
Clearances 
without Canopy
3b
3c
Clearance* from 
Top of Fireplace Opening (“)
Mantel (Combustible) 
Projections (“)
Clearance to Combustible 
Mantel Projections with 4” 
Canopy
T225
Fig. 3  Clearances to combustibles.
*Combustible Projections 
above the fireplace must be 
within the area described by the 
dashed line.
8
10
12
14
16
18
20
22
24
2 4
6
8 10
8
10
12
14
16
18
20
22
2 4
6
8 10
6
T225
mantel clearance
2/04
Clearance to Combustible 
Mantel Projections without 
Canopy
3d