PROCEDURE: (INTAkE AND EXHAUST)
Make  sure  that  the  piston  is  at  Top  Dead  Center 
(TDC)  of  it’s  compression  stroke  (both  valves 
closed). The  valve  clearance  should  be  0.05-0.1mm 
(0.002-0.004 in.) cold.
Check  and  adjust  the  valve  to  rocker  arm  clearance 
as follows:
1.  Remove the four (4) screws from the rocker cover.
2.  Remove the rocker cover and rocker cover gasket.
3.  Loosen the rocker arm jam nut. Use a 10mm allen wrench 
to  turn  the  pivot  ball  stud  and  check  the  clearance 
between  the  rocker  arm  and  the  valve  stem  with  a  flat 
feeler gauge (see Figure 44).
4.  When the valve clearance is correct, hold the pivot ball 
stud  with  the  allen  wrench  and  tighten  the  rocker  arm 
jam  nut. Torque  the  jam  nut  to  174  inch  pounds.  After 
tightening  the  jam  nut,  recheck  the  valve  clearance  to 
make sure it did not change.
0.076 mm
(0.003") SHIM
JAM NUT
BALL STUD
Figure 44
5.  Re-install  the  rocker  cover  gasket,  rocker  cover  and 
the four (4) screws.
RESULTS:
Adjust valve clearance as necessary, then retest.
teSt 78 – check Wire 18 continuity
DISCUSSION:
During cranking and running the printed circuit board 
receives  a  pulse  from  the  ignition  magnetos  via Wire 
18.  This  signal  has  an  AC  voltage  of  4-6  volts  on 
V-Twin  engines  only.  If  this  signal  is  not  received  by 
the printed circuit board the unit will shut down due to 
no RPM sensing.
PROCEDURE: (V-TWIN ONLY)
1.  Set a VOM to measure AC voltage.
2.  Connect one meter test lead to Wire 18 that is connected 
to the bolt connector shown in Figure 46. Connect the 
other meter test lead to a clean frame ground.
3.  Set  the  AUTO-OFF-MANUAL  switch  to  the  MANUAL 
position. 
4.  When the generator comes up to rated speed, measure and 
record the voltage reading. 4-6 VAC should be measured.
5.  If the correct voltage was not measured in Step 4, refer 
back to flow chart. If the correct voltage was measured, 
proceed to Step 6.
WIRE 18
CONNECTION
Figure 45. Wire 18 Connection 8 kW Units
WIRE 18 CONNECTION
Figure 46. Wire 18 Connection 10-20 kW Units 
6.  Set a VOM to measure resistance.
7.  Disconnect  the  J1  Connector  from  the  printed  circuit 
board.
8.  Verify  the  continuity  of Wire  18.  Connect  one  meter 
test  lead  to  a  clean  frame  ground.  Connect  the  other 
meter  test  lead  to  Pin  Location  J1-4  for  all  models.  A 
reading  of  275K  -  325K  ohms  should  be  measured.  If 
CONTINUITY is measured (0.1 ohms) a short to ground 
could be present.
9.  Disconnect Wire 18 from the stud connector. Continue to 
leave J1 disconnected from Step 7.