PROCEDURE:
1.  Set a VOM to measure resistance.
2.  Disconnect the J2 Connector from the controller.
3.  Connect  one  meter  test  lead  to  the  ground  terminal. 
Connect the other meter test lead to each of the follow-
ing J2 connector pin locations.
J2-11 Wire 56
8kW
If CONTINUITY was measured, 
go to Step 4. Average nominal 
resistance reading is 4 ohms: 
Single Cylinder Starter Contactor 
(SC) 4 ohms,
Choke Solenoid (CS) is 4 ohms.
10 kW - 20 kW
If CONTINUITY was measured, 
go to Step 5.
Average nominal resistance reading 
is 150-160 ohms.
V-twin Starter Contact Relay 
(SCR): 150-160 ohms.
Choke Solenoid (CS) 4 ohms.
J2-3 Wire 14
8kW
If CONTINUITY was measured, 
go to Step 6. Average nominal 
resistance reading is 16 ohms: 
Fuel Solenoid (FS): 16 ohms.
10kw
If CONTINUITY was measured, 
go to Step 7. Average nominal 
resistance reading is 16 ohms. 
Fuel Solenoids (FS) 16 ohms, 
(FS2) 7 ohms. Choke Solenoid 
(CS) 4 ohms.
10 kW - 20 kW
If CONTINUITY was measured, 
go to Step 8. Average nominal 
resistance reading is 16 ohms.
Fuel Solenoid (FS) 16 ohms. 
Choke Solenoid (CS) 4 ohms.
J2-12 Wire 4
10 kW - 20 kW
If RESISTANCE was measured, 
go to Step 9.
For average nominal resistance 
reading of the rotor, refer to the 
front of the manual.
4.  Disconnect  Wire  56  and  Wire  0  from  the  Starter 
Contactor  (SC).  Disconnect  the  Choke  Solenoid 
(CS) connector.
a.  Connect one meter test lead to the SC terminal 
from which Wire 56 was removed. Connect the 
other  meter  test  lead  to  the  ground  terminal,  4 
ohms  should  be  measured.  If  zero  resistance 
was measured, replace the SC.
b.  Connect one meter test lead to the CS connec-
tor Wire  56.  Connect  the  other  meter  test  lead 
to  the  CS  connector  Wire  90.  4  ohms  should 
be measured. If zero resistance was measured, 
replace the Choke Solenoid.
c.  If  coil  resistance  was  measured  in  the  Starter 
Contactor, and Choke Solenoid Wire 56 is short-
ed to ground between the J2 Connector and SC 
or CS, repair or replace the shorted wire. 
5.  Disconnect Wire  56  from  the  Starter  Contactor  Relay 
(SCR). Disconnect the Choke Solenoid (CS) connector.
a.  Connect one meter test lead to the SCR terminal 
from  which  Wire  56  was  removed.  Connect  the 
other  meter  test  lead  to  the  ground  terminal.  4 
ohms should be measured. If zero resistance was 
measured, replace the 
Starter Contactor Relay
.
b.  Connect one meter test lead to the CS connec-
tor Wire  56.  Connect  the  other  meter  test  lead 
to  the  CS  connector  Wire  90.  4  ohms  should 
be measured. If zero resistance was measured, 
replace the 
Choke Solenoid
.
If coil resistance was measured in SCR and CS Wire 
56 is shorted to ground between J2 connector and SC 
or CS, repair or replace the shorted wire. 
6.  Disconnect Wire 14 from the Fuel Solenoid (FS). 
a.  Connect one meter test lead to the FS terminal 
from which Wire 14 was removed. Connect the 
other meter test lead to the ground terminal. 16 
ohms  should  be  measured.  If  zero  resistance 
was measured, replace the Fuel Solenoid.
b.  If  coil  resistance  was  measured  in  FS Wire  14 
is shorted to ground between J2 connector and 
FS, repair or replace the shorted wire. 
7.  Disconnect Wire  14  from  the  Fuel  Solenoid  (FS),  Fuel 
Solenoid 2 (FS2), and Choke Solenoid (CS),
a.  Connect one meter test lead to the FS terminal 
from which Wire 14 was removed. Connect the 
other meter test lead to the ground terminal. 16 
ohms  should  be  measured.  If  zero  resistance 
was measured, replace the Fuel Solenoid.
b.  Connect  one  meter  test  lead  to  the  FS2  termi-
nal from which Wire 14 was removed. Connect 
the other meter test lead to the ground terminal. 
7 ohms should be measured. If zero resistance 
was measured, replace 
Fuel Solenoid 1
c.  At  the  CS  connector,  connect  one  meter  test 
lead  to  Wire  14  connect  the  other  meter  test 
lead  to  Wire  90.  4  ohms  should  be  measured. 
If  zero  resistance  was  measured,  replace  the 
Choke Solenoid
.
Page 145
sEctioN 4.4
DiaGNostic tEsts
DC CONTROL
Part 4