Tandberg Data Tandberg LTO2 사용자 설명서

다운로드
페이지 85
 
- 12 -
 
2.5 Switching ON the Power Switch and the Power-On 
Sequence 
 
Switching ON the power of the Autoloader executes an automatic power-on sequence.   
 
1. Connect the AC power cable. 
 
2. Press the right side ( | ) of the Autoloader front panel power switch to switch the power ON. 
 
3. When the power is supplied, the POWER LED lights in green and the power-on test starts. 
 
4. When the power-on test ends normally, "READY" and "DRV empty" are alternately 
displayed on the top level of the LCD. 
 
 
 
 
 
 
 
 
 
 
 
 
 
Figure 2-6 Powering on the LTO2 Autoloader 
 
 
2.6 SCSI ID Setting 
 
 
Please check that the SCSI ID of the Autoloader is not already being used by a 
server/workstation or another SCSI device. (Prior to shipping from the factory, the SCSI ID of 
the Autoloader was set as described below.)   
 
See "3.6 Setting the SCSI ID" for information about how to check the SCSI IDs that have been 
set and for the method of changing them when required.   
 
 
Important 
 
The Autoloader and the tape drive must each have an independent SCSI ID. 
This device has a specification that does not allow duplication of the tape drive 
and Autoloader IDs. Please check that the IDs of other SCSI devices on the 
same SCSI bus do not duplicate the IDs of the tape drive and the Autoloader.
 
 
 
SCSI ID at time of factory shipping   
  Tape drive   :  (1) 
                          
  Autoloader  :  (0) 
Power switch