Chapter 4 – Getting Started 
This chapter will guide you through setting up your RamSan-500.  It is 
important to accomplish the following tasks to make your system usable: 
  Use the front panel display to set up the network (Section 4.5) 
  Get the Web monitor operational (Section 4.7) 
  Use the Web monitor to set the date and time (Section 4.8) 
  Use the Web monitor to configure advanced network settings (Section 
4.9) 
  Use the Web monitor to configure security (Section 4.10) 
Other sections explore the configuration tools and should be read to 
familiarize you with the system. 
4.1 Turning on the System 
Separate power cables should be connected to each of the two RamSan-
500 power modules. The 3-prong AC inlet lies at the bottom of each power 
module. To power on the system, both power modules should be switched 
on. Though the RamSan-500 will operate when only one power supply is 
switched on, this is not recommended. After a user-initiated shutdown, 
switch both power modules off, then switch both modules on again to 
bring the system back on-line.   
4.2 System Initialization 
The front panel display shows the boot process’ current state. Once the 
power is connected, the system turns on automatically and the front panel 
display begins the power-on sequence. The following happens 
automatically: 
System Status: 
GOOD 
1      2      3      4     
  Once AC power is connected, the 
RamSan will power-up and the 
front panel displays “System 
Status: GOOD” and shows the 
performance bars for each Fibre 
Channel port. The numbers 
represent the Fibre Channel 
Controllers. If a controller is not 
installed, the number and 
corresponding performance will not 
display. The top bars represent 
port A and the bottom bars 
represent port B. 
 
The system is now ready for normal operation.