INSTALLING OPTIONS AND ACCESSORIES
EATON Powerware
®
9395 UPS (1000–1100 kVA) Installation and Operation Manual
S
164201764 Rev 1 www.powerware.com
5−13
5.5
Installing an Optional Supervisory Contact Module II
To install SCM II wiring:
1.
Verify the UPS system is turned off and all power sources are removed. See
Chapter 7, UPS Operating Instructions," for shutdown instructions.
Chapter 7, UPS Operating Instructions," for shutdown instructions.
2.
NOTE If mounting to a hollow wall, secure the enclosure to a wood or metal stud within the wall. Do not
use hollow wall anchors.
use hollow wall anchors.
3.
Securely mount the SCM II at the desired location. See Figure 5-14 on page 5−17
for mounting hole locations.
for mounting hole locations.
NOTE When installing signal wiring for CAN card J3 terminals, conduit must be installed between the
device and the UPS cabinet.
device and the UPS cabinet.
4.
Remove the ISBM cabinet top right interface conduit landing plate to drill or
punch conduit holes (see Figure 4-16 on page 4−18).
punch conduit holes (see Figure 4-16 on page 4−18).
5.
Reinstall the conduit landing plate.
6.
Install conduit between the UPS and SCM II. See Figure 5-14 on page 5−17 for
SCM II knockout hole location.
SCM II knockout hole location.
7.
Install wiring between the UPS and SCM II. See Figure 5-2 and Table 5-1 for the
Powerware Hot Sync CAN Bridge Card terminal location and wiring information,
and Figure 5-10, Figure 5-8, and Table 5-5 for the SCM II terminal location and
wiring information.
Powerware Hot Sync CAN Bridge Card terminal location and wiring information,
and Figure 5-10, Figure 5-8, and Table 5-5 for the SCM II terminal location and
wiring information.
NOTE 120 Vac for the SCM II should be supplied from the critical bus by facility planners or the customer.
8.
Install 120 Vac power wiring from the critical bus to the SCM II. See Figure 5-10,
Figure 5-8, and Table 5-5 for the terminal location and wiring information.
Figure 5-8, and Table 5-5 for the terminal location and wiring information.
Ground
Terminal
Terminal
Terminal TB1 Signal
Connections from the UPS
Connections from the UPS
Terminal TB3
120 Vac Power
120 Vac Power
Terminal TB2 Customer
Supervisory Contact Interface
Supervisory Contact Interface
Figure 5-10. Supervisory Contact Module II Terminal Location