Juniper Networks EX4200 사용자 설명서

다운로드
페이지 284
Table 24: Site Preparation Checklist (continued)
Date
Performed By
For More Information
Item or Task
Verify that your rack or cabinet meets the
minimum requirements for the installation of
the switch.
Plan rack or cabinet location, including required
space clearances.
Secure the rack or cabinet to the floor and
building structure.
Wall
Verify that the wall meets the minimum
requirements for the installation of the switch.
Verify that there is appropriate clearance in
your selected location.
Cables
Acquire cables and connectors:
Determine the number of cables needed
based on your planned configuration.
Review the maximum distance allowed
for each cable. Choose the length of cable
based on the distance between the
hardware components being connected.
Plan the cable routing and management.
Related Topics
82
Site Preparation Checklist for EX3200 and EX4200 Switches
Complete Hardware Guide for EX3200 and EX4200 Ethernet Switches