Netgear GS752TXS 사용자 설명서

다운로드
페이지 36
  Chapter 4.  Installation    
|
    
25
GS752TXS Smart Switch Hardware Installation Guide 
Figure 9. Stacking Topologies
The device is “Plug and Play” in terms of stacking configuration. Before powering up the 
device, connect the devices into the required stacking topology. Then power up the devices. 
By default, the switch is configured to allow the master and slave designations to be 
determined through automatic discovery. You can use the web interface to configure the 
stack to select a particular switch as master after the device has been booted and is 
operational (see the 
System > Stacking page).
For more information on stacking see the 
Software Administration Manual. A link to this 
document is on your Resource CD.
Step 7: Applying AC Power
The GS752TXS Smart Switch does not have an ON/OFF switch. Power is controlled by the 
power cord connection. 
Before connecting the power cord, select an AC outlet that is not controlled by a wall switch, 
which can turn off power to the switch. After selecting an appropriate outlet, use the following 
procedure to apply AC power:
1. 
Connect the end of the power connection cable to the power receptacle on the back of 
the switch.
2. 
Connect the AC power connection cable into a power source such as a wall socket or 
power strip.
When you apply power, the Power LED on the switch’s front panel illuminates.
If the Power LED does not go on, check that the power cable is plugged in correctly and that 
the power source is good. If this does not resolve the problem, refer to 
.