Patton electronic 4110 사용자 설명서

다운로드
페이지 78
Introduction
78
SmartNode 4520 & 4110 Series User Manual 
G • Installation checklist
Introduction
This appendix lists the tasks for installing a SmartNode 4520 or 4110 Series router (see 
) . Make a copy 
of this checklist and mark the entries as you complete each task. For each SmartNode 4520 or 4110 Series 
router, include a copy of the completed checklist in your site log.
Table 15. Installation checklist
Task
Verified by
Date
Network information available & recorded in site log
Environmental specifications verified
Site power voltages verified
Installation site pre-power check completed
Required tools available
Additional equipment available
All printed documents available
SmartWare release & build number verified
Rack, desktop, or wall mounting of chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Cable length limits verified
Initial configuration performed
Initial operation verified