BLOOMFIELD 1000 사용자 설명서

다운로드
페이지 30
INSTALLATION 
READ THIS CAREFULLY BEFORE STARTING THE INSTALLATION
 
This general information may  not apply to all models.  Refer to 
the owners manual and any technical data sheets for your      
specific equipment  for additional information. 
 
PREPARATION 
 
Unpack the unit.  Inspect all components for completeness and 
condition.  Ensure that all packing materials have been removed 
from the unit.  
 
Verify that the Spray Head Gasket and Spray Disk are properly 
installed.  
IMPORTANT:  The gasket must be installed INSIDE the brew 
head cup. 
 
Verify that an adjustable leg is installed at each corner of the 
brewer, and, if provided, the rubber foot is installed on each leg. 
 
Set Brewer in its operating location.  Level the Brewer.  A spirit 
level should be placed on the top of the unit, at the edge, as a 
guide when making level adjustments. 
 
Level the unit from left to right and front to back by turning the  
adjustable feet.  Be sure all four feet touch the counter to prevent 
tipping. 
 
PLUMBER’S INSTALLATION INSTRUCTIONS  
 
Brewer should be connected to a POTABLE WATER, COLD 
WATER
 line.  Flush water line before connecting to Brewer.  
  
DO NOT use a saddle valve with a self-piercing tap for the water 
line connection.  Such a tap can become restricted by waterline 
debris.  For systems that must use a saddle tap,  shut off the main 
water supply and drill a 3/16” (minimum) tap for the saddle     
connection, in order to insure an ample water supply.  Remember 
to flush the line prior to installing the saddle. 
 
The brewer must be installed on a water line with average     
pressure between 20 PSI and 90 PSI.  If your water pressure   
exceeds 90 PSI at anytime, a pressure regulator must be 
installed in the water supply  line to limit the pressure to not more 
than 90 PSI in order to avoid damage to lines and solenoid. 
 
A water shut-off valve should be installed on the incoming water 
line in a convenient location (Use a low restriction type valve, 
such as a 1/4-turn ball valve, to avoid loss of water flow thru the 
valve. 
 
The provided water line strainer must be installed in the supply 
line, between the shutoff valve and inlet fitting.  Note FLOW     
arrow marking on strainer body. 
IMPORTANT: 
To enable the installer to make 
a quality installation and to  
minimize installation time, the 
following suggestions and tests 
should be done before the     
actual unit installation is started: 
 
 
CAUTION:   
ELECTRICAL 
DAMAGE 
 
DO NOT plug in or energize this 
appliance until all Installation 
Instructions are read and       
followed.  Damage to the 
Brewer will occur if these 
instructions are not followed. 
 
 
CAUTION: 
UNSTABLE 
EQUIPMENT HAZARD 
 
It is very important for safety 
and for proper operation that the 
brewer is level and stable when 
standing in its final operating 
position.  Provided adjustable, 
non-skid legs must be installed 
at each corner of the unit.    
Failure to do so will result in 
movement of the brewer which 
can cause personal Injury and/
or damage to brewer. 
 
 
NOTE:  Water supply inlet line 
must meet certain minimum 
criteria to insure successful 
operation of the brewer. 
Bloomfield recommends 1/4" 
copper tubing for installation of 
less than 12 feet and 3/8" for 
more than 12 feet from a 1/2" 
water supply line.