Vermont Casting LHER20 사용자 설명서

다운로드
페이지 28
12
10005360
LHE Series Natural Vent Insert
First Firing
Upon completing the gas line connec-
tion, a small amount of air will be in 
the lines. When first lighting unit with 
pilot light, it will take a few minutes 
to purge themselves of this air. Once 
the purging is complete, the pilot 
and burner will light and operate as 
indicated in the instruction manual. 
Subsequent lightings of the heater will 
not require such purging.
When lit for the first time, the appli-
ance will emit a slight odor for awhile. 
This is due to paint and lubricants 
used in the manufacturing process. 
After each lighting, vapor may con-
dense and fog the glass; this moisture 
disappears within a few minutes of 
burning.
Flame Adjustment (RN/RP Models)
For fireplaces equipped with HI/LO valves, flame 
adjustment is accomplished by rotating the HI/LO 
adjustment knob located near the center of the gas 
control. (Figs. 20 or 21)
LO
HI
Turn
counterclockwise
to decrease
flame height
Turn clockwise
to increase
flame height
HV102
Honeywell hi/lo knob
4/5/99   djt
Fig. 20  Flame adjustment knob for Honeywell Valve.
Honeywell Valve
It is important to periodically perform 
a visual check of the pilot and the 
burner flames. Compare them to the 
Figure 22 and Figure 23 or 24. If any 
of the flames appear abnormal call a 
service person.
Flame Characteristics
Large Lava Rock Placement
The large lava rock provided with this fireplace should 
be placed on the firebox base on either side of the 
burner assembly.
Under no circumstances should these 
lava rocks be placed on top of the burner 
assembly.
e.  Place the front right log (KR26). Position the log 
notch against the third grate from the right, and 
the other edge of the log on top of the rear right 
log notch. Ensure the log is secure in place.
f.  Place the burner lava rock on the front area of the 
burner housing. (Fig. 19)
LG286
LHEDV30 
Logs
4/03
KR22
KR25
KR24
KR23
KR26
Burner Lava 
Rock
Fig. 19   LHEC30 and LHER30 log and lava rock placement.
Front Grate
LG286
LG285
LHEDV20
logs
4/03
JR9
JR7
JR8
JR10
LG285
Burner Lava Rock
Fig. 18  LHEC20 and LHER20 log and lava rock placement.
Front Grate