Avaya 555-231-743 사용자 설명서

다운로드
페이지 274
GuestWorks and DEFINITY ECS Release 9
Technician Handbook for Hospitality Installations  
555-231-743  
Issue 1
November 2000
Translations and Testing 
216
Switch-to-PMS Link Translations 
Testing the Switch-to-PMS Link
To test the switch-to-PMS link, have the hotel designate a room for testing. Testing 
the switch-to-PMS link includes the following:
Link testing with the RS232 mini-tester (
Netcon and data module testing (
PMS testing and status (
)
Database swap testing (
)
Check-in and check-out testing (
)
Message waiting testing (both manual messages and voice messages) 
(
)
Controlled restrictions testing (
Housekeeping status testing (
).
During the switch-to-PMS testing, you will use the list pms-down command often 
to view events that may indicate problems with the link. These events are found in 
.