Avaya 555-231-743 사용자 설명서
GuestWorks and DEFINITY ECS Release 9
Technician Handbook for Hospitality Installations
Technician Handbook for Hospitality Installations
555-231-743
Issue 1
November 2000
Translations and Testing
216
Switch-to-PMS Link Translations
Testing the Switch-to-PMS Link
To test the switch-to-PMS link, have the hotel designate a room for testing. Testing
the switch-to-PMS link includes the following:
the switch-to-PMS link includes the following:
■
Link testing with the RS232 mini-tester (
■
Netcon and data module testing (
■
PMS testing and status (
)
■
Database swap testing (
)
■
Check-in and check-out testing (
)
■
Message waiting testing (both manual messages and voice messages)
(
(
)
■
Controlled restrictions testing (
■
Housekeeping status testing (
).
During the switch-to-PMS testing, you will use the list pms-down command often
to view events that may indicate problems with the link. These events are found in
to view events that may indicate problems with the link. These events are found in
.