reqUireMentS FOr the cOMMOnWeALth OF 
MASSAchUSettS
For all side wall horizontally vented gas fueled 
equipment installed in every dwelling, building or 
structure used in whole or in part for residential 
purposes, including those owned or operated by 
the Commonwealth and where the side wall ex-
haust vent termination is less than seven (7) feet 
above finished grade in the area of the venting, 
including but not limited to decks and porches, 
the following requirements shall be satisfied:
INSTALLATION OF CARBON 
MONOXIDE DETECTORS
At the time of installation of the side wall horizon-
tal vented gas fueled equipment, the installing 
plumber or gasfitter shall observe that a hard 
wired carbon monoxide detector with an alarm 
and battery backup is installed on the floor level 
where the gas equipment is to be installed. In 
addition, the installing plumber or gasfitter shall 
observe that a battery operated or hard wired car-
bon monoxide detector with an alarm is installed 
on each additional level of the dwelling, building or 
structure served by the side wall horizontal vented 
gas fueled equipment. It shall be the responsibility 
of the property owner to secure the services of 
qualified licensed professionals for the installation 
of hard wired carbon monoxide detectors.
In  the  event  that  the  side  wall  horizontally 
vented  gas  fueled  equipment  is  installed 
in a crawl space or an attic, the hard wired 
carbon  monoxide  detector  with  alarm  and 
battery back-up may be installed on the next 
adjacent floor level.
In  the  event  that  the  requirements  of  this 
subdivision  can  not  be  met  at  the  time  of 
completion  of  installation,  the  owner  shall 
have a period of thirty (30) days to comply with 
the above requirements; provided, however, 
that during said thirty (30) day period, a battery 
operated carbon monoxide detector with an 
alarm shall be installed.
Approved Carbon Monoxide Detectors
Each carbon monoxide detector as required 
in accordance with the above provisions shall 
comply with NFPA 720 and be ANSI/UL 2034 
listed and IAS certified.
SIGNAGE
A metal or plastic identification plate shall be 
permanently mounted to the exterior of the 
building at a minimum height of eight (8) feet 
above grade directly in line with the exhaust 
vent terminal for the horizontally vented gas 
fueled heating appliance or equipment. The 
sign shall read, in print size no less than 1/2" in 
size, "GAS VENT DIRECTLY BELOW. KEEP 
CLEAR OF ALL OBSTRUCTIONS".
INSpECTION
The state or local gas inspector of the side 
wall horizontally vented gas fueled equipment 
shall not approve the installation unless, upon 
inspection,  the  inspector  observes  carbon 
monoxide detectors and signage installed in 
accordance with the provisions of 248 CMR 
5.08(2)(a) 1 through 4.
EXEMPTIONS: The following equipment is ex-
empt from 248 CMR 5.08(2)(a) 1 through 4:
•  The equipment listed in Chapter 10 entitled 
"Equipment Not Required To Be Vented" 
in the most current edition of NFPA 54 as 
adopted by the Board; and
•  Product Approved  side  wall  horizontally 
vented gas fueled equipment installed in a 
room or structure separate from the dwell-
ing, building or structure used in whole or 
in part for residential purposes.
MANUFACTURER REqUIREMENTS
Gas Equipment Venting System Provided 
When the manufacturer of Product Approved 
side wall horizontally vented gas equipment 
provides a venting system design or venting 
system components with the equipment, the 
instructions provided by the manufacturer for 
installation of the equipment and the venting 
system shall include:
•  Detailed instructions for the installation of 
the venting system design or the venting 
system components; and
•  A complete parts list for the venting system 
design or venting system.
Gas Equipment Venting System Not 
provided
When  the  manufacturer  of  a  Product Ap-
proved side wall horizontally vented gas fu-
eled equipment does not provide the parts for 
venting the flue gases, but identifies "special 
venting systems", the following requirements 
shall be satisfied by the manufacturer:
•  The referenced "special venting system" in-
structions shall be included with the appliance 
or equipment installation instructions; and
•  The "special venting systems" shall be Prod-
uct Approved by the Board, and the instruc-
tions for that system shall include a parts list 
and detailed installation instructions.
A  copy  of  all  installation  instructions  for  all 
Product Approved  side  wall  horizontally 
vented gas fueled equipment, all venting in-
structions, all parts lists for venting instruc-
tions,  and/or  all  venting  design  instructions 
shall remain with the appliance or equipment 