3com S7906E 설치 설명서

다운로드
페이지 2621
 
1-41 
Figure 1-14 Network diagram for NQA collaboration configuration example  
Vlan-int2
10.1.1.1/24
Vlan-int2
10.1.1.2/24
Vlan-int3
10.2.1.1/24
Switch C
Vlan-int3
10.2.1.2/24
Switch B
Switch A
 
 
Configuration procedure 
1)  Assign each interface an IP address. (omitted) 
2)  On Switch A, configure a unicast static route and associate the static route with a track entry. 
# Configure a static route, whose destination address is 10.2.1.1, and associate the static route with 
track entry 1. 
<SwitchA> system-view 
[SwitchA] ip route-static 10.1.1.2 24 10.2.1.1 track 1 
3)  On Switch A, create an NQA test group. 
# Create an NQA test group with the administrator name being admin and operation tag being test
[SwitchA] nqa entry admin test 
# Configure the test type of the NQA test group as ICMP echo. 
[SwitchA-nqa-admin-test] type icmp-echo 
# Configure the destination IP address of the ICMP echo test operation as 10.2.1.1. 
[SwitchA-nqa-admin-test-icmp-echo] destination ip 10.2.1.1 
# Configure the interval between two consecutive tests as 100 milliseconds. 
[SwitchA-nqa-admin-test-icmp-echo] frequency 100 
# Create collaboration entry 1. If the number of consecutive probe failures reaches 5, collaboration with 
other modules is triggered. 
[SwitchA-nqa-admin-test-icmp-echo] reaction 1 checked-element probe-fail threshold-type 
consecutive 5 action-type trigger-only 
[SwitchA-nqa-admin-test-icmp-echo] quit 
# Configure the test start time and test duration for the test group. 
[SwitchA] nqa schedule admin test start-time now lifetime forever 
4)  On Switch A, create the Track entry. 
# Create Track entry 1 to associate it with Reaction entry 1 of the NQA test group (admin-test). 
[SwitchA] track 1 nqa entry admin test reaction 1 
5)  Verify the configuration. 
# On Switch A, display information about all the Track entries. 
[SwitchA] display track all 
Track ID: 1 
  Status: Positive