Netgear M4200-10MG-PoE+ (GSM4210P) - Multigigabit Managed Switch with 8*2.5G and 2x10G SFP+ Layer 3 하드웨어 매뉴얼

다운로드
페이지 31
Installation 
25
 Managed Switch Series M4200
Step 5: Check the Installation
Before you apply power to the switch, perform the steps that are described in this section.
To check the installation:
1. 
Inspect the equipment thoroughly.
2. 
Verify that all cables are installed correctly.
3. 
Check cable routing to make sure that cables are not damaged or creating a safety hazard.
4. 
Ensure that all equipment is mounted properly and securely.
Optional Step 6: Install SFP Transceiver Modules
The following optional procedure describes how to install an optional SFP transceiver module 
into one of the SFP ports of the switch. For information about supported modules, see 
Note:
Contact your NETGEAR sales office to purchase these modules. If 
you do not want to install an SFP module, skip this procedure.